Data Centre Seminars - Left Section Banner - Level 2Keysource Data Centres

An invitation to view one of the most efficient data centres in Britain

Keysource engineers have re-invented the data centre cooling concept to deliver an annualised Power Usage Effectiveness (PUE) figure of under 1.2 for the first time in the UK. Having won three industry awards for this data centre in 2009, Petroleum Geo-Services (PGS) are delighted with the results of the project and have given us the opportunity to reveal details of the design and construction to a small number of guests.

Keysource will unveil energy efficiency strategies which can save you 45% on your energy bills and still support high density IT loads with high levels of resilience.  We will demonstrate how to maximize ROI whilst achieving the most efficient and resilient data centres possible.

Hosted by: Keysource and Petroleum Geo-Services (PGS)
Date: 20th October 2010
Venue:
Mercedes Benz World’s, Brooklands, Weybridge, Surrey, KT13 0SL
Time: 9 - 12.30 or 1pm - 4.30pm
Agenda 

Why attend?

If you are planning a new data centre build or refreshing essential infrastructure in the next 18 months, you need to attend this seminar. You will leave the day with ideas and strategies which can be implemented within your own facility. 

Who will benefit from this seminar?

Data Centre Operators, IT Managers, Facilities Managers and Estates Directors planning a new facility or wanting to improve their existing data centre. Companies needing to reduce their electricity consumption in IT or Financial Directors looking to reduce OPEX costs will also benefit from attending.

Registration

To register your interest in these seminars please register, phone Amy Parcell today on 0845 204 3333 or email amy.parcell@keysource.co.uk.

Success story

"Great session, delivered exactly what was stated. Knowledge of all the people involved was excellent”

Seminar feedback

"A timely seminar invite from Keysource landed on my desk claiming to "bridge the gap" between IT and Facilities. I must say that since working with Keysource I believe the gap has closed considerably. With the help of Keysource we have worked together in developing the specification and I already feel that when completed both IT and Facilities will have joint ownership of the new Server Room"

Peter Boxall, Bayer PLC

  • Keysource Ltd, registered in England at North Heath Estate, Horsham, West Sussex, RH12 5QE, Reg No. 3663128.