UPS Systems Generators Racks Cooling Computer Room design & build
KEYSOURCE SWITCHED-ON INFRASTRUCTURE

  

"we suffered a major power failure a couple of weeks back that saw the generator running from 8pm on Monday evening thru to 4am the following day. The Keysource set up saw our data centre up and running the entire time and a fuel top up was arranged the same day. Excellent!"

Allan Fitzwater, BMRB

Our Services

Service Contracts: UPS, Generator, Air Conditioning and Fire Suppression

Buying equipment is a relatively simple process – you identify your requirements, and then match those requirements against the offering in the marketplace. Yet, often, people forget the most important aspect of purchasing – will your supplier be able to ensure continuity of operation, and will they be able to repair it quickly and effectively if it goes wrong.

At Keysource, we consider ourselves to be a service-based organisation, with many millions of pounds of equipment installed on mission-critical systems. Just as our equipment ensures the availability of our clients IT systems, we provide the infrastructure to ensure the uptime of the systems we provide.

With a team of highly experienced, geographically based field engineers, we can provide a rapid response to any problem that you may encounter, and with a wide range of service options, we can tailor an after-sales backup to suit your precise needs.

Service Repair Engineer

The options range from an ad hoc service to a wide variety of service contract types, each one focusing on the needs of a particular client profile. And one must not forget the humble preventative maintenance visit, often curing a problem that the client does not yet know exists.

With response times to fit your operations, and superb engineers, we are recognised as a premier supplier of service products. Everyone always hopes that their system will not fail, but at Keysource we understand the urgency of any failure, and our service department will work tirelessly to ensure that, in this unlikely event, the effect on your systems will be minimised.

  Contact us today for expert advice

              0845 2043333

Did you know?

From our initial measurement of over 80 UK data centres, we estimate that between 25-40% of data centre power can be saved.

Data Centre Efficiency

News

Register now Keysource and HP's 'Driving Down Data Centre Energy Costs' seminars in Manchester 08/10/08 & Bristol 05/11/08   

Keysource design a 'green solution' for North Tyneside Council

best practice data centre solution for Newcastle College

Home Group use  Computational Fluid Dynamics to help optimise capacity 

Need to improve your data centre's efficiency?  Sign up for a Data Centre infrastructure Efficiency assessment

Keysource's installations

Brand new Data Centre White Papers

Keysource join The Green Grid

Press Releases

Keysource announces CFD  partnership

'Power your datacentre for less'. Keysource in Computer Weekly

Read Keysource in Datacentre Solutions 

 
pixel