UPS Systems Generators Racks Cooling Computer Room design & build
KEYSOURCE SWITCHED-ON INFRASTRUCTURE

  

"we suffered a major power failure a couple of weeks back that saw the generator running from 8pm on Monday evening thru to 4am the following day. The Keysource set up saw our data centre up and running the entire time and a fuel top up was arranged the same day. Excellent!"

Allan Fitzwater, BMRB

Our Services

UPS Installations

UPS Install Packages

 

Our vast experience in the specification and installation of UPS products ensures that we can supply, deliver, position, connect and commission large scale projects on time and in budget.

 

 

Delivering equipment to site

Did you know?

From our initial measurement of over 80 UK data centres, we estimate that between 25-40% of data centre power can be saved.

Data Centre Efficiency

News

Register now Keysource and HP's 'Driving Down Data Centre Energy Costs' seminars in Manchester 08/10/08 & Bristol 05/11/08   

Keysource design a 'green solution' for North Tyneside Council

best practice data centre solution for Newcastle College

Home Group use  Computational Fluid Dynamics to help optimise capacity 

Need to improve your data centre's efficiency?  Sign up for a Data Centre infrastructure Efficiency assessment

Keysource's installations

Brand new Data Centre White Papers

Keysource join The Green Grid

Press Releases

Keysource announces CFD  partnership

'Power your datacentre for less'. Keysource in Computer Weekly

Read Keysource in Datacentre Solutions 

 
pixel