Data Centre design and build for automotive manufacturer

A new data centre designed and built within the basement of a new large production facility on the site of their existing technology centre. Serving the new facility it also acts as a fail over for the primary data centre.

Key Features

 

Design Key Facts

Total Facility 200m2
Racks 20 day 1. 50 final
Facility Power Density 1.25kW/m2
IT Load 250kW
Rack Power Density 12kW
PUE Design Figure 1.3
Resilience N+1 M&E design