New data centre design and build for PGS

Keysource worked with Petroleum Geo-Services (PGS) to provide them with a high performance data centre at their HQ office that significantly reduced power usage and achieved considerable cost savings, reduced carbon footprint and has an annualised PUE of 1.15

Key Features

Design Key Facts

Total Facility 533m2
Racks 94
Facility Power Density 3.37kW/m2
IT Load 600kW – 1800kW
Rack Power Density 30kW
PUE Design Figure 1.2
Resilience N+1


Case Study - Award Winning HPC Data Centre

See how we delivered one of the most efficient data centres in the world by re-inventing data centre cooling.

Download the case study

Contact Us

Please fill in the form below and a member of the team will be in touch shortly.
  • This field is for validation purposes and should be left unchanged.