Keysource Maximises IT Capacity in a Restricted Space
The challenge: Royal Holloway, University of London, had an ageing computer room which no longer met current IT needs and did not possess the capacity for any future growth plans. As a result, a bespoke data centre solution was required, to be located in a building previously used as a lecture theatre which could be installed rapidly and cost effectively.
The solution: The appointment of Keysource was crucial as it was able to deliver the project from start to finish. Keysource initially provided consultancy to the university and worked through all the options available to Royal Holloway to help gain a better understanding of the commercial and operational needs of the new facility. This meant that the university could make a fully informed decision. As a result, Keysource developed a scalable data centre that is suitable for the university’s current and future IT requirements; maximises uptime in the event of power failure; and utilises the most appropriate technology. The solution involved a full development and installation package covering design, construction, project management and monitoring services. For further technical information, please read the full case study.
The benefits: Keysource provided a complete data centre solution that was managed end-to-end to deliver a turnkey data centre on-time and on-budget in less than five months from initial engagment. Rolloway Holloway gained a cost-effective design that enables its IT equipment to be supported in a redundant and scalable environment to meet current and future predicted needs.
Mark Chisholm, Project Surveyor, Estate Services at Royal Holloway, University of London, says: “Keysource has developed a high-quality data centre solution that significantly increases our computing capability and offers expansion potential to handle future growth. Royal Holloway is an expanding university, so it is essential that it possess the infrastructure to support plans moving forward. Keysource has delivered on its promises and the dedication of its staff has contributed to the overall success of the project”